{"id":2644,"date":"2019-10-18T06:15:26","date_gmt":"2019-10-18T06:15:26","guid":{"rendered":"https:\/\/dev.metronorth.health.qld.gov.au\/caboolture\/?page_id=2644"},"modified":"2019-11-13T06:31:31","modified_gmt":"2019-11-13T06:31:31","slug":"caboolture-hospital-redevelopment","status":"publish","type":"page","link":"https:\/\/dev.metronorth.health.qld.gov.au\/caboolture\/caboolture-hospital-redevelopment","title":{"rendered":"Caboolture Hospital Redevelopment"},"content":{"rendered":"<p><div class=\"fusion-fullwidth fullwidth-box fusion-builder-row-1 nonhundred-percent-fullwidth non-hundred-percent-height-scrolling\" style=\"--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-padding-bottom:0px;--awb-margin-bottom:0px;--awb-flex-wrap:wrap;\" ><div class=\"fusion-builder-row fusion-row\"><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-0 fusion_builder_column_3_4 3_4 fusion-three-fourth fusion-column-first\" style=\"--awb-bg-size:cover;--awb-margin-bottom:0px;width:75%;width:calc(75% - ( ( 4% ) * 0.75 ) );margin-right: 4%;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-column-wrapper-legacy\"><div class=\"fusion-title title fusion-title-1 fusion-sep-none fusion-title-text fusion-title-size-one\"><h1 class=\"fusion-title-heading title-heading-left\" style=\"margin:0;\">Caboolture Hospital Redevelopment<\/h1><\/div><div class=\"fusion-text fusion-text-1\"><h2>About the project<\/h2>\n<p>By 2031, the population of Caboolture and surrounds is expected to grow by 51%. With all the extra people to care for, and with our hospital already near or at capacity most days, Caboolture Hospital must grow, too.<\/p>\n<p>The Queensland Government has committed $352.9 million to deliver 130 new beds and significantly expand services at Caboolture Hospital.<\/p>\n<p>Over the next four years, Caboolture Hospital will undergo a significant expansion and redevelopment.<\/p>\n<p>The Caboolture Hospital Redevelopment will include the construction of a five storey Clinical Services Building and a targeted refurbishment of existing spaces.<\/p>\n<p>A larger hospital requires more car parking and $41.7M has also been provided to deliver a new multi-story carpark.<\/p>\n<p>The design of the new clinical services building is expected to be completed in mid-2020 with construction expected to start in mid-2020 and take up to three years to complete.<\/p>\n<p>The new building and car park will be built at the front of the hospital, between the existing hospital and McKean Street.<\/p>\n<\/div><div class=\"fusion-text fusion-text-2\"><h2>New and expanded services<\/h2>\n<p><img decoding=\"async\" class=\"chredev-img alignright wp-image-2675 size-400\" src=\"https:\/\/dev.metronorth.health.qld.gov.au\/caboolture\/wp-content\/uploads\/sites\/4\/2019\/10\/caboolture-hospital-redeveloment-drawing-400x252.jpg\" alt=\"Caboolture Hospital Redevelopment\" width=\"400\" height=\"252\" srcset=\"https:\/\/dev.metronorth.health.qld.gov.au\/caboolture\/wp-content\/uploads\/sites\/4\/2019\/10\/caboolture-hospital-redeveloment-drawing-200x126.jpg 200w, https:\/\/dev.metronorth.health.qld.gov.au\/caboolture\/wp-content\/uploads\/sites\/4\/2019\/10\/caboolture-hospital-redeveloment-drawing-238x150.jpg 238w, https:\/\/dev.metronorth.health.qld.gov.au\/caboolture\/wp-content\/uploads\/sites\/4\/2019\/10\/caboolture-hospital-redeveloment-drawing-300x189.jpg 300w, https:\/\/dev.metronorth.health.qld.gov.au\/caboolture\/wp-content\/uploads\/sites\/4\/2019\/10\/caboolture-hospital-redeveloment-drawing-320x202.jpg 320w, https:\/\/dev.metronorth.health.qld.gov.au\/caboolture\/wp-content\/uploads\/sites\/4\/2019\/10\/caboolture-hospital-redeveloment-drawing-400x252.jpg 400w, https:\/\/dev.metronorth.health.qld.gov.au\/caboolture\/wp-content\/uploads\/sites\/4\/2019\/10\/caboolture-hospital-redeveloment-drawing-600x379.jpg 600w, https:\/\/dev.metronorth.health.qld.gov.au\/caboolture\/wp-content\/uploads\/sites\/4\/2019\/10\/caboolture-hospital-redeveloment-drawing-700x441.jpg 700w, https:\/\/dev.metronorth.health.qld.gov.au\/caboolture\/wp-content\/uploads\/sites\/4\/2019\/10\/caboolture-hospital-redeveloment-drawing-768x485.jpg 768w, https:\/\/dev.metronorth.health.qld.gov.au\/caboolture\/wp-content\/uploads\/sites\/4\/2019\/10\/caboolture-hospital-redeveloment-drawing-800x505.jpg 800w, https:\/\/dev.metronorth.health.qld.gov.au\/caboolture\/wp-content\/uploads\/sites\/4\/2019\/10\/caboolture-hospital-redeveloment-drawing.jpg 881w\" sizes=\"(max-width: 400px) 100vw, 400px\" \/>The Caboolture Hospital Redevelopment is a complex mix of new build and a refurbishment of the existing facility and covers a total gross floor area of approximately 32,000sqm.<\/p>\n<h3>New five storey Clinical Services Building<\/h3>\n<ul>\n<li>New and expanded Emergency Department<\/li>\n<li>20-bed rehabilitation unit<\/li>\n<li>10-bed palliative care unit<\/li>\n<li>14-bed geriatric evaluation and management unit<\/li>\n<li>32-bed medical ward<\/li>\n<li>10-bed Intensive Care Unit<\/li>\n<li>2 additional operating theatres and 4 stage one recovery spaces<\/li>\n<li>8-bed Cardiac Care Unit<\/li>\n<li>4-bed Chest Pain Assessment Unit and 16-bed medical ward<\/li>\n<\/ul>\n<h3>Targeted refurbishment within existing hospital<\/h3>\n<ul>\n<li>Enhanced and expanded special care nursery with 15 bays<\/li>\n<li>Medical day stay unit<\/li>\n<li>Upgraded and expanded morgue<\/li>\n<li>Expanded medical records facility, pharmacy and pathology<\/li>\n<li>New main entry, caf\u00e9 and visitor lounge<\/li>\n<\/ul>\n<h3>Multi-storey carpark<\/h3>\n<ul>\n<li>Will provide approximately 1,080 spaces in a mix of multi-story and at-grade facilities.<\/li>\n<li>Combined with other car spaces around the site, there will be a total of approx. 1640 spaces.<\/li>\n<\/ul>\n<\/div><div class=\"fusion-sep-clear\"><\/div><div class=\"fusion-separator fusion-full-width-sep\" style=\"margin-left: auto;margin-right: auto;margin-top:20px;width:100%;\"><\/div><div class=\"fusion-sep-clear\"><\/div><div class=\"fusion-builder-row fusion-builder-row-inner fusion-row\"><div class=\"fusion-layout-column fusion_builder_column_inner fusion-builder-nested-column-0 fusion_builder_column_inner_1_1 1_1 fusion-one-full fusion-column-first fusion-column-last\" style=\"--awb-padding-top:10px;--awb-padding-right:10px;--awb-padding-left:10px;--awb-bg-color:#f6f6f6;--awb-bg-color-hover:#f6f6f6;--awb-bg-size:cover;--awb-border-color:#008598;--awb-border-style:solid;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-column-wrapper-legacy\"><div class=\"fusion-title title fusion-title-2 fusion-sep-none fusion-title-text fusion-title-size-two\"><h2 class=\"fusion-title-heading title-heading-left\" style=\"margin:0;\">Related projects<\/h2><\/div><div class=\"accordian fusion-accordian\" style=\"--awb-border-size:1px;--awb-icon-size:13px;--awb-content-font-size:1rem;--awb-icon-alignment:left;--awb-hover-color:#f9f9f9;--awb-border-color:#cccccc;--awb-background-color:#ffffff;--awb-divider-color:#e0dede;--awb-divider-hover-color:#e0dede;--awb-icon-color:#ffffff;--awb-title-color:#3366cc;--awb-content-color:#000000;--awb-icon-box-color:#333333;--awb-toggle-hover-accent-color:#008598;--awb-title-font-family:&quot;Raleway-Regular-TTF&quot;;--awb-title-font-weight:700;--awb-title-font-style:normal;--awb-title-font-size:1.2143rem;--awb-title-line-height:1.2;--awb-content-font-family:&quot;Open Sans&quot;;--awb-content-font-style:normal;--awb-content-font-weight:400;\"><div class=\"panel-group fusion-toggle-icon-boxed\" id=\"accordion-2644-1\"><div class=\"fusion-panel panel-default panel-d7043ed37f41631fc fusion-toggle-has-divider\"><div class=\"panel-heading\"><h4 class=\"panel-title toggle\" id=\"toggle_d7043ed37f41631fc\"><a aria-expanded=\"false\" aria-controls=\"d7043ed37f41631fc\" role=\"button\" data-toggle=\"collapse\" data-parent=\"#accordion-2644-1\" data-target=\"#d7043ed37f41631fc\" href=\"#d7043ed37f41631fc\"><span class=\"fusion-toggle-icon-wrapper\" aria-hidden=\"true\"><i class=\"fa-fusion-box active-icon awb-icon-minus\" aria-hidden=\"true\"><\/i><i class=\"fa-fusion-box inactive-icon awb-icon-plus\" aria-hidden=\"true\"><\/i><\/span><span class=\"fusion-toggle-heading\">Temporary car park<\/span><\/a><\/h4><\/div><div id=\"d7043ed37f41631fc\" class=\"panel-collapse collapse \" aria-labelledby=\"toggle_d7043ed37f41631fc\"><div class=\"panel-body toggle-content fusion-clearfix\">\n<p>The development of the Caboolture Hospital Redevelopment and Multi-Storey Carpark will require the resumption of a large portion of the current car parking.<\/p>\n<p>A new temporary, staff-only, car park will be built on the Caboolture State High School land adjoining Mewett Street. The current staff car park will be repurposed as a patient and visitor car park. This will help ensure there is enough parking for both visitors and staff, during construction.<\/p>\n<p>The temporary staff car park is due to start construction in late 2019 and is expected to be operational in March 2020. Additional arrival and wayfinding works will be undertaken at the rear of the site to ensure arrivals to the hospital are clear, straight forward and safe.<\/p>\n<p>For more information, <a href=\"https:\/\/dev.metronorth.health.qld.gov.au\/caboolture\/wp-content\/uploads\/sites\/4\/2019\/10\/temporary-car-parking-fact-sheet.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">download this fact sheet<\/a>.<\/p>\n<\/div><\/div><\/div><div class=\"fusion-panel panel-default panel-054a7c6c4e7b46274 fusion-toggle-has-divider\"><div class=\"panel-heading\"><h4 class=\"panel-title toggle\" id=\"toggle_054a7c6c4e7b46274\"><a aria-expanded=\"false\" aria-controls=\"054a7c6c4e7b46274\" role=\"button\" data-toggle=\"collapse\" data-parent=\"#accordion-2644-1\" data-target=\"#054a7c6c4e7b46274\" href=\"#054a7c6c4e7b46274\"><span class=\"fusion-toggle-icon-wrapper\" aria-hidden=\"true\"><i class=\"fa-fusion-box active-icon awb-icon-minus\" aria-hidden=\"true\"><\/i><i class=\"fa-fusion-box inactive-icon awb-icon-plus\" aria-hidden=\"true\"><\/i><\/span><span class=\"fusion-toggle-heading\">Emergency Department interim expansion<\/span><\/a><\/h4><\/div><div id=\"054a7c6c4e7b46274\" class=\"panel-collapse collapse \" aria-labelledby=\"toggle_054a7c6c4e7b46274\"><div class=\"panel-body toggle-content fusion-clearfix\">\n<p><strong>Stage 1:<\/strong> Specialist Outpatient Department (completed)<br \/>\n<strong>Stage 2:<\/strong> Medical Imaging Department (completed)<br \/>\n<strong>Stage 3:<\/strong> Expansion of the existing Emergency Department (first phase completed in August 2019; second phase expected to be completed in late 2019)<\/p>\n<p>Once completed, the expanded Emergency Department will include:<\/p>\n<ul>\n<li>Refurbished reception area<\/li>\n<li>Separate waiting areas for adults, children and Fast Track<\/li>\n<li>3 triage assessment rooms<\/li>\n<li>A dedicated and secure Children\u2019s assessment area, including triage and four beds<\/li>\n<li>6 Fast Track beds (2 additional)<\/li>\n<li>8 Short Stay beds and 4 Short Stay chairs (4 additional beds and 2 additional chairs)<\/li>\n<li>A dedicated mental health assessment area (3 spaces, increasing from 1)<\/li>\n<li>16 acute treatment spaces for adults (1 additional than current)<\/li>\n<li>A new procedure room<\/li>\n<li>4 resuscitation bays (currently available)<\/li>\n<li>Relatives room (moved and refurbished)<\/li>\n<\/ul>\n<\/div><\/div><\/div><div class=\"fusion-panel panel-default panel-9622cc8bd2d0d0866 fusion-toggle-has-divider\"><div class=\"panel-heading\"><h4 class=\"panel-title toggle\" id=\"toggle_9622cc8bd2d0d0866\"><a aria-expanded=\"false\" aria-controls=\"9622cc8bd2d0d0866\" role=\"button\" data-toggle=\"collapse\" data-parent=\"#accordion-2644-1\" data-target=\"#9622cc8bd2d0d0866\" href=\"#9622cc8bd2d0d0866\"><span class=\"fusion-toggle-icon-wrapper\" aria-hidden=\"true\"><i class=\"fa-fusion-box active-icon awb-icon-minus\" aria-hidden=\"true\"><\/i><i class=\"fa-fusion-box inactive-icon awb-icon-plus\" aria-hidden=\"true\"><\/i><\/span><span class=\"fusion-toggle-heading\">Emergency Department Mental Health Short Stay Unit<\/span><\/a><\/h4><\/div><div id=\"9622cc8bd2d0d0866\" class=\"panel-collapse collapse \" aria-labelledby=\"toggle_9622cc8bd2d0d0866\"><div class=\"panel-body toggle-content fusion-clearfix\">\n<p>A mental health short stay unit will be built to provide short-term treatment, observation, assessment and re-assessment of patients triaged and assessed in the Emergency Department. The ward will include eight bed bays.<\/p>\n<p>Construction is expected to begin in late 2019 and the unit is expected to open in April 2020.<\/p>\n<\/div><\/div><\/div><\/div><\/div><div class=\"fusion-clearfix\"><\/div><\/div><\/div><\/div><div class=\"fusion-title title fusion-title-3 fusion-sep-none fusion-title-text fusion-title-size-two\" style=\"--awb-margin-bottom:0px;--awb-margin-bottom-small:0px;\"><h2 class=\"fusion-title-heading title-heading-left\" style=\"margin:0;\">Project timeline<\/h2><\/div><div class=\"fusion-clearfix\"><\/div><\/div><\/div><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-1 fusion_builder_column_1_4 1_4 fusion-one-fourth fusion-column-last rhs-col\" style=\"--awb-bg-size:cover;width:25%;width:calc(25% - ( ( 4% ) * 0.25 ) );\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-column-wrapper-legacy\"><div class=\"fusion-builder-row fusion-builder-row-inner fusion-row\"><div class=\"fusion-layout-column fusion_builder_column_inner fusion-builder-nested-column-1 fusion_builder_column_inner_1_1 1_1 fusion-one-full fusion-column-first fusion-column-last contact-us\" style=\"--awb-bg-size:cover;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-column-wrapper-legacy\"><div class=\"fusion-text fusion-text-3\"><div class='has-marker fusion-row campus-map' data-zoom='17'><div id='map_1775493890-4093' class='location_map location_marker standard' data-centre='-27.080436274152227,152.96349147406613' data-zoom='17'>\r\n\t\t\t\t\t\t\t<div class='marker' data-lat='-27.080269976928342' data-lng='152.9635825753212' >\r\n\t\t\t\t\t\t\t\t<h4>Caboolture Hospital<\/h4>\r\n\t\r\n\t\t\t\t\t\t\t<\/div>\r\n\t\t\t\t\t\t<\/div><\/div><div id='control-div-map_1775493890-4093' class='control-div'>\r\n  \t\t\t\t\t\t<div id='control-ui-map_1775493890-4093' class='control-ui' title = 'Click to reset the map'>\r\n    \t\t\t\t\t\t\t<div id='control-text-map_1775493890-4093' class='control-text'>\r\n      \t\t\t\t\t\t\t\t<i class='fa fa-undo' aria-hidden='true'><\/i><span>Reset<\/span>\r\n    \t\t\t\t\t\t\t<\/div>\r\n  \t\t\t\t\t\t<\/div>\r\n\t\t\t\t\t<\/div><script>\r\n\t\t\t\t\t\tjQuery(document).ready(function(){\r\n\t\t\t\t\t\t\t createMap( 'map_1775493890-4093' );\t\t\t\t\t\t\t\t\t\t\r\n\t\t\t\t\t\t});\r\n\t\t\t\t\t<\/script>\n<h2>More information<\/h2>\n<p><strong>Redevelopment Project Team<\/strong><br \/>\n<strong>Phone:<\/strong>\u00a0 (07)&nbsp;5316&nbsp;5464<br \/>\n<strong>Email:<\/strong> <a style=\"overflow-wrap: break-word;\" href=\"mailto:Caboolture_Projects@health.qld.gov.au\">Caboolture_Projects@health.qld.gov.au<\/a><\/p>\n<\/div><div class=\"fusion-clearfix\"><\/div><\/div><\/div><\/div><div class=\"fusion-clearfix\"><\/div><\/div><\/div><\/div><\/div><div class=\"fusion-fullwidth fullwidth-box fusion-builder-row-2 nonhundred-percent-fullwidth non-hundred-percent-height-scrolling\" style=\"--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-padding-bottom:0px;--awb-margin-top:0px;--awb-flex-wrap:wrap;\" ><div class=\"fusion-builder-row fusion-row\"><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-2 fusion_builder_column_3_4 3_4 fusion-three-fourth fusion-column-first\" style=\"--awb-bg-size:cover;width:75%;width:calc(75% - ( ( 4% ) * 0.75 ) );margin-right: 4%;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-column-wrapper-legacy\"><div class=\"fusion-text fusion-text-4\"><p>[cool-timeline layout=&#8221;simple&#8221; animation=&#8221;none&#8221; date-format=&#8221;Y&#8221; icons=&#8221;YES&#8221; show-posts=&#8221;20&#8243; skin=&#8221;default&#8221; order=&#8221;ASC&#8221; story-content=&#8221;full&#8221;]<\/p>\n<\/div><div class=\"fusion-clearfix\"><\/div><\/div><\/div><\/div><\/div><div class=\"fusion-fullwidth fullwidth-box fusion-builder-row-3 nonhundred-percent-fullwidth non-hundred-percent-height-scrolling\" style=\"--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-flex-wrap:wrap;\" ><div class=\"fusion-builder-row fusion-row\"><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-3 fusion_builder_column_1_1 1_1 fusion-one-full fusion-column-first fusion-column-last\" style=\"--awb-bg-size:cover;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-column-wrapper-legacy\"><style>\n.cab-timeline {color: #fff!important}\n.timeline-main-title {display: none!important;}\n.chredev-img {border: 1px solid #ddd; padding: 5px;}\n<\/style><div class=\"fusion-clearfix\"><\/div><\/div><\/div><\/div><\/div><\/p>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":8,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"tags":[],"class_list":["post-2644","page","type-page","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/dev.metronorth.health.qld.gov.au\/caboolture\/wp-json\/wp\/v2\/pages\/2644","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dev.metronorth.health.qld.gov.au\/caboolture\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/dev.metronorth.health.qld.gov.au\/caboolture\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/dev.metronorth.health.qld.gov.au\/caboolture\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/dev.metronorth.health.qld.gov.au\/caboolture\/wp-json\/wp\/v2\/comments?post=2644"}],"version-history":[{"count":25,"href":"https:\/\/dev.metronorth.health.qld.gov.au\/caboolture\/wp-json\/wp\/v2\/pages\/2644\/revisions"}],"predecessor-version":[{"id":2684,"href":"https:\/\/dev.metronorth.health.qld.gov.au\/caboolture\/wp-json\/wp\/v2\/pages\/2644\/revisions\/2684"}],"wp:attachment":[{"href":"https:\/\/dev.metronorth.health.qld.gov.au\/caboolture\/wp-json\/wp\/v2\/media?parent=2644"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dev.metronorth.health.qld.gov.au\/caboolture\/wp-json\/wp\/v2\/tags?post=2644"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}